The Malatesta station is located in Piazza Roberto Malatesta, one of the central hubs of the Prenestino-Labicano district.

Stazione Malatesta esterno

In operation

The Malatesta station is located in Piazza Roberto Malatesta, one of the central hubs of the Prenestino-Labicano district.

It has a rectangular plan with a length of 119 meters, a width of 33 meters, and a depth of approximately 22 meters, to which a shallower structure in the shape of a T is attached, with a depth of 9 meters, which provides the street exits on the north side. To the east of the station body, there is an additional exit with an excavation depth of 14 meters.

The station extends over 4 underground levels: the underground square level, the atrium level, the turnstile level, and the platform level. In addition to these, there are the roof slab and the foundation slab. The structure was entirely excavated using the top-down method. The completion of the station construction was carried out in an upward direction, involving the installation of the waterproofing layer between the diaphragm wall and the inner lining before the construction of the latter.

Stazione Malatesta atrio

Station Entrances

The station has 4 distinct entrances: two entrances on the north side, each equipped with a fixed staircase and two escalators, connecting the street level to the atrium level. A third entrance on the east side of the station directly connects the street level to the turnstile level, also equipped with a fixed staircase and two escalators. The fourth entrance to the station is directly on the underground square level and is accessible from the steps of the square.

The surface arrangement involves creating a large central pedestrian square measuring approximately 90×65 meters. To the north of this area, there are bus terminals and stops for some public transportation services on the surface, directly connected to the station entrances. The new circulation tangential to the square emphasizes Piazza Malatesta’s role as an important gathering point for both the neighborhood and the surrounding areas.

The surface space is strongly characterized by three important architectural features: the stairwell covers, two located to the north in opposite positions, effectively enclosing the perimeter of the large square, and the other to the east on the head of the traffic island on Via R. Malatesta, facing Via Acqua Bullicante. This creates a pedestrian pathway that leads users to the entrance of the subway line. In the center, the street-level square, which is roughly rectangular in shape, opens onto an underground square accessible from the north side of the bus terminal via two parallel staircases perpendicular to the station’s axis. On the opposite side, to the south, there is a wide staircase flanked by a more comfortable set of stairs, providing a less hurried approach to the square below and simultaneously creating a large resting area.

End Benefits and Sustainability

The Malatesta station is designed as an important gathering space for the community, as well as a central hub for the neighborhood, facilitating the transition between public bus services and rail services. The underground square, designed to accommodate commercial activities in addition to those already existing on the perimeter of the square, serves as a passage and resting space for citizens.

Stazione Malatesta aprile 2015

Architecture

The design of the Malatesta station was entrusted to the engineering and architecture firm Erregi S.r.l..

The focal point of the Malatesta station is the underground square, a space for gathering and passage, connecting the street level with the intermediate station atrium. The expansive continuous steel and glass façade that separates the open space from the covered station area serves as a source of natural light for the atrium and provides visual continuity between the two spaces.

The external canopies enclosing the staircases are a common element in some of the Line C stations. They are constructed with a parallelepiped concrete structure open on three sides at the upper landing level and are covered with beveled travertine slabs laid in a continuous pattern. The roof is finished with a metal sheet having parallel ridges running along the long side of the canopy.

Stazione Malatesta discenderie

Finishes and Compensation Bands

The finishes of the station follow the standards of Line C Metro stations. The floors are made of anthracite-colored porcelain stoneware, and the wall claddings are in white Metro C glass topped with a signage band. The ceiling in the atrium and turnstile areas is made of pre-painted aluminum sheet in a Scottish pattern integrated with recessed lighting fixtures and other system components.

The compensation bands are made of plasterboard. The high atrium ceiling is made of plasterboard and aluminum slats creating symmetries and patterns that echo the shape of the station. The lower atrium ceiling is partly made of plasterboard and aluminum slats, and in the paid area, it features a diffuser ceiling consisting of pre-painted white Metro C aluminum panels with adjacent rectangular modules. The platform ceilings, on the other hand, are made with curved profiled elements in pre-painted white aluminum sheet. The signage band at the platform level is integrated with lighting fixtures and cameras.

Linea C

The Line C under construction includes 3 stations: Porta Metronia, Colosseo – Fori Imperiali, and Venezia. These stations will enter the heart of Rome and will allow the enjoyment of the artifacts found in the excavations thanks to the planned museum setups. The Colosseo station will also be the junction between Line C and the already operational Line B of the Rome metro, expanding the network effect of the capital’s mobility.

22 STATIONS IN OPERATION

The Line C currently in operation connects the southeastern suburbs to the San Giovanni station, a transfer point with Line A and the first example in Rome of a museum station. The route continues through 22 stations.

The Venezia – Clodio/Mazzini route will run through stations Chiesa Nuova, San Pietro, Ottaviano, which is the second interchange node of Line C with Line A, and Clodio/Mazzini.

As a possible opportunity to extend Line C, the Farnesina – Clodio/Mazzini route is in the preliminary design phase by the Client. The project under study includes the construction of two stations: Auditorium and Farnesina. The first will be located near the Auditorium Parco della Musica and the Palazzetto dello Sport; the second will allow a quicker connection to important places for the city such as the Foro Italico, the Olympic Stadium, as well as the Ministry of Foreign Affairs and the Institutes of Public Administration.

Monte Compatri/Pantano

22 Stations in operation

The Monte Compatri/Pantano Station, the eastern terminus of the line, represents a significant rubber-steel interchange hub, thanks to two large parking areas, one of which is a multi-level parking and the other is at ground level, allowing for the parking of private vehicles.

Graniti

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Graniti Station has been open to the public since November 9, 2014.

Finocchio

22 Stations in operation

"The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Finocchio Station has been open to the public since November 9, 2014.

Bolognetta

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Bolognetta Station has been open to the public since November 9, 2014.

Borghesiana

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Borghesiana Station has been open to the public since November 9, 2014.

Due Leoni/Fontana Candida

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Due Leoni/Fontana Candida Station has been open to the public since November 9, 2014.

Grotte Celoni

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Grotte Celoni Station has been open to the public since November 9, 2014.

Torre Gaia

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Torre Gaia Station has been open to the public since November 9, 2014.

Torre Angela

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Torre Angela Station has been open to the public since November 9, 2014.

Torrenova

22 Stations in operation

The 10 pre-existing stations of the Termini-Pantano railway have been modernized according to the technological and architectural standards of the new Line, adapting their functional and plant characteristics. The Torrenova Station has been open to the public since November 9, 2014.

Giardinetti

22 Stations in operation

The Giardinetti Station, the only completely new surface station, is the point where the underground line meets the surface line. It is characterized by a trapezoidal shape with large windows and is equipped with a parking lot with over 200 car spaces. The station's atrium, at street level, is accessible from Via Casilina. The Giardinetti Station has been open to the public since November 9, 2014.

Torre Maura

22 Stations in operation

The Torre Maura Station is located at the confluence of Via Giglioli and Via Tobagi. It is accessible through three entrances, two along Via Casilina and one on Via Giglioli. The Torre Maura Station has been open to the public since November 9, 2014.

Torre Spaccata

22 Stations in operation

The Torre Spaccata Station is located between Via Tor Tre Teste and Via di Torre Spaccata, accessible from both sides of Via Casilina. The Torre Spaccata Station has been open to the public since November 9, 2014.

Alessandrino

22 Stations in operation

The Alessandrino Station is built under Via Casilina, between Piazza Sor Capanna and Viale Alessandrino, and is accessible from both the square and Via Casilina. The Alessandrino Station has been open to the public since November 9, 2014.

Parco di Centocelle

22 Stations in operation

The Centocelle Park Station, located between Via Casilina and Via Palmiro Togliatti, one of the major arterial roads of the Capital, is situated opposite the large Centocelle Urban Archaeological Park. The Centocelle Park Station has been open to the public since November 9, 2014.

Mirti

22 Stations in operation

The Mirti Station is built beneath the square of the same name, a symbol of one of the populated and lively neighborhoods of the Capital. The station is accessible through 4 entrances and 2 elevators. The square has been completely redeveloped. The Mirti Station has been open to the public since June 29, 2015.

Gardenie

22 Stations in operation

The Gardenie Station, located beneath the square of the same name, has three entrances, one across Viale della Primavera, connected by an underpass, and two on the north side of the square, which has been completely redeveloped. The Gardenie Station has been open to the public since June 29, 2015.

Teano

22 Stations in operation

The Teano Station, accessible from both Via Teano and Viale Partenope, is characterized by large spaces designated for commercial activities and a spacious atrium that can be used for events, exhibitions, and various initiatives. The Teano Station has been open to the public since June 29, 2015.

Discover more

Malatesta

22 Stations in operation

The Malatesta Station is built beneath the square of the same name, where bus terminals and stops are located. The new pedestrian square is characterized in the center by an open-air hypogeal space, accessible via a staircase that connects the outside with the station's intermediate atrium: a large space designated for commercial, cultural activities, and events, which gives back to the neighborhood a place for gathering and socializing. The Malatesta Station has been open to the public since June 29, 2015.

Discover more

Pigneto

22 Stations in operation

The Pigneto Station, constructed near the intersection of Via del Pigneto and Circonvallazione Casilina, will constitute an important interchange node with the soon-to-be-completed FL1 railway line. The area above the station has been completely redeveloped, with the creation of an equipped park and a sports field. The Pigneto Station has been open to the public since June 29, 2015.

Discover more

Lodi

22 Stations in operation

The Lodi Station, the temporary terminus of the line, is situated beneath Via La Spezia (stretch between Via Orvieto and Via Foligno), a very important thoroughfare for the city. To adapt the presence of the subway to the historical and urban context in which it is located, the only elements visible on the surface are the steel and glass structures of the elevators and the station entrances. The Lodi Station has been open to the public since June 29, 2015.

San Giovanni

22 Stations in operation

The San Giovanni Station plays a fundamental role in the construction of Line C, especially because it represents the first interchange node with the existing Line A. The project underwent several evolutions following the results of archaeological investigations. The discovery of ancient structures to be preserved, up to a depth of about 18-20 meters from the ground level, led the Special Superintendence for the Archaeological Heritage of Rome to prescribe the impossibility of carrying out ground consolidations from the ground level, favoring open-air excavations with archaeological methods in the backfill soils, up to about 19 meters deep, excluding the realization of mechanized excavations for the construction of line tunnels in the section between San Giovanni Station and Amba Aradam/Ipponio Station.

Discover more

Porta Metronia

Route under construction

The station is located midway between the Fori Imperiali Station (interchange Line C/Line B) and the San Giovanni Station (interchange Line C/Line A), specifically about 500 meters south of Piazza San Giovanni in Laterano and 300 meters from the entrances of the hospital of the same name.

Discover more

Fori Imperiali/Colosseo

Route under construction

The Fori Imperiali Station is situated beneath the street of the same name, in the area between the Colosseum (Flavian Amphitheatre) and the area in front of the Basilica of Maxentius.

Discover more

Venezia

Route under construction

The Venezia Station is located beneath the square of the same name in a strategic position as it is situated at the junction connecting the Baroque center of Rome and the archaeological area of Via dei Fori Imperiali. One of the two exits is planned to be in front of Palazzo Venezia, near Via del Plebiscito. The second exit is expected to be at Piazza Madonna di Loreto.

Discover more

Chiesa Nuova

Design in progress

The Chiesa Nuova Station is located beneath the square of the same name, near the Church of Santa Maria in Vallicella and the adjacent Oratorio dei Filippini, a complex of exceptional historical and artistic importance.

San Pietro

Design in progress

The San Pietro Station is located to the west of Castel Sant’Angelo, near Largo Giovanni XXIII/Piazza Pia and Lungotevere Vaticano.

Ottaviano

Design in progress

The Ottaviano Station, characterized by its connection with Line A, is entirely underground and is located along the axis of Via Barletta, with the connecting structure to the Line A station situated on the side of Viale Giulio Cesare.

Clodio/Mazzini

Design in progress

The Clodio-Mazzini Station is located beneath Piazza Bainsizza, along the terminal part of Via Monte Santo, to optimize the flow of users from the Prati district.

Auditorium

Future developments

The Auditorium Station is situated in the open spaces surrounding the Palazzetto dello Sport between Viale Pierre de Coubertin and Viale Tiziano, currently landscaped and partially used as a parking area.

Farnesina

Future developments

The Farnesina Station, located beneath the surface of the "Farnesina" impound lot for towed vehicles, is characterized by its surroundings, which include significant facilities such as the Ministry of Foreign Affairs, the monumental complex of the Foro Italico, the stadium, public administration institutes, university residences, etc. Two entrances are planned, located respectively in front of the Ministry of Foreign Affairs and on Via Antonio da San Giuliano, near Ponte Milvio. For the terminal station of the route, an expansion of the existing parking areas is envisaged, with two large park-and-ride facilities.