Rome, Linea C
22 stations complete and in operation.
NEAR COMPLETION
FUTURE DEVELOPMENTS
FINAL DESIGNS DELIVERED
UNDER CONSTRUCTION
IN OPERATION

Some numbers

25,6 km
Length of section between Monte Compatri/Pantano and Clodio Mazzini
30
stations
22
stations complete and in operation
2
stations under construction (Amba Aradam and Fori Imperiali)
10
existing surface stations: renovation and systems upgrade
13
ventilation
800 mt
approximate average distance between stations

Interchanges and connecting stations

2
with Underground Line A (San Giovanni and Ottaviano)
1
with Underground Line B (Fori Imperiali)
1
with the FL1 Regional Railway (Pigneto)

0
More than 19 km of tunnels built with 4 TBMs, and equipped
0
TBMs used for excavations
0
Central Train Dispatchers’ Office to automatically operate the entire Line C
0
trains circulating on the line in operation
0
ml of automatic platform screen doors
0
energy-efficient lamps
0
escalators
0
lifts
0
m2 Graniti Depot Area
0
m of tracks, with 140 Line/Depot switches

Metro C S.c.p.A.’s member companies