SECOND TBM PLACED IN VIA SANNIO SHAFT
The second of the two TBMs (Tunnel Boring Machines) that will be excavating the tunnels of Line C’s central section (T3), from Shaft 3.3 on Via Sannio to the Fori Imperiali Station in the heart of Rome’s historic shaft, has been lowered into the shaft as well.
- CANTIERE POZZO 3.3 VARO TBM