Support interventions
In Section T3, the Line/monuments interaction study led to the implementation of structural and/or geotechnical support interventions, temporary and/or definitive, for the following monuments:
- Aurelian Walls at Porta Asinaria: temporary shoring of the walls and construction of a bulkhead of piles supporting Porta Asinaria
- Aurelian Walls at Porta Metronia: temporary shoring of the walls and compensation grouting during the passage of the TBM
- Church of Santa Maria in Domnica: temporary internal and external shoring and interventions to safeguard the artistic heritage inside the church
- Church of Santo Stefano Rotondo: banding of the tholobate and interventions to safeguard the artistic heritage inside the church
- Pylon of Celimontano Aqueduct: temporary shoring
- Temple of Venus and Roma: temporary shoring
- Basilica of Maxentius: temporary shoring of outer walls and definitive chaining interventions with ropes and bars
- Columns of Forum of Nerva: temporary shoring.
All the monuments that fall within the subsidence basin of the Line C works are continuously monitored by means of large-scale vibrational, structural, geomatic and geotechnical monitoring.

AURELIAN WALLS PORTA ASINARIA

AURELIAN WALLS PORTA METRONIA

SANTA MARIA IN DOMNICA CHURCH

SANTO STEFANO ROTONDO CHURCH

PILOT OF AQUEDUCT CELIMONTANO

TEMPLE OF VENUS AND ROME

BASILICA OF MASSENZIO

COLONNACCE AT THE FORUM OF NERVA